Standing Water in Prepared Footings: A Problem or a Precaution?
by JAMES R. BATY II
Created: May 18, 2015 for Concrete Contractor Magazine
In this column, the Concrete Foundations Association explains frequent concerns lifted by homeowners as they are engaging a contractor or during the construction process. These issues are offered to you, the concrete contractor as a way of better understanding your customer and identifying the gap that exists between your message and their understanding.
This column deals with the concern for structural integrity of concrete footings due to water in the excavation.
Home owner Question: I visited the site of my new home and noticed a lot of water standing where the concrete walls will soon be poured. Won’t this be a problem for the quality of concrete in my footings? – Home Owner (Missouri).
This is a very common question, particularly during the predominantly rainy spring construction season. Concrete, as we know, is a basic mixture of water, cement, sand and large aggregate. There are also chemicals in virtually all of modern mixes for a variety of performance enhancements. One of the most critical parts of the mix design is the specified water-cementitious material ratio (w/cm). This specification will ultimately determine the effective strength properties of the mix as well as controlling the volumetric change during the hardening changes. This column has previously addressed the nature of increased water in mix designs.
At the very heart of this question is the basic idea that if a concrete mix is placed into water it will be harder for it to dry and therefore harden to be strong enough to support the structure. After all, most homeowners see concrete as a fluid that must first dry to get hard and if even more water is present, it must be like the glue their children use in school and weaken as the water mixes in. Although the homeowner may be justified with some concern for the presence of standing water, the strength of the concrete in the foundation is more than likely not part of it.
One of the duties of the contractor is to provide assurance for the performance of your construction. When it comes to a concrete mix, that assurance includes some basic facts:
- The strength of a concrete mix comes from the ratio of water to cement (or cementitious material) and is referred to as the w/cm.
- Once created at the ready mix plant, the introduction of water “into” the mix will weaken the concrete and may upset the w/cm ratio more than the design calls for.
- Concrete weighs more than water and it will displace the water when introduced into any container or form rather than mixing with that water.
- Concrete hardens due to a chemical reaction and does not “dry” to harden. Water is required for the chemical reaction to occur with the cementitious material. Concrete piers for a bridge over a body of water is an excellent example of concrete hardening in water.
ACI 332-141 states in the commentary section R6.2.4:
…If the footing form permits water to exit, the hydraulic pressure of the concrete placement is sufficient to displace the water from the formed areas and prevent segregation.
This commentary builds on the minimum code requirement for not placing concrete in confined areas with water. This section provides recognition that concrete has a mass greater than that of water and during a placement operation, the concrete will displace or move the water due to a combination of this mass and the force of discharge creating a greater hydraulic pressure than the water can withstand. Moving ahead of the concrete placement, the water will exit the formed footing space at the first opportunity. If the footings are excavated into the undisturbed soil and there is no point at which the slope produces a natural exit, the concrete placement force and weight is still likely to force the water to exit over the top of the footing space. As long as the placement proceeds to fully displace the water, there should be no cause for concern. Only when the concrete does not fully displace the water will the partial volume of concrete and water result in segregation of the concrete mix where the large aggregate is separated from the cement paste.
Some precautions to follow include:
- Prevent the water from segregating the mix or being incorporated in the mix by pushing the water with the flow of the concrete. A recommended practice for all concrete placement, this keeps the hydraulic pressure of the concrete flow influencing the water.
- Provide a way for water to escape during the placement at key junctures in the forms if possible.
The homeowner is likely also concerned with seeing mud, knowing that mud is softer than dry soil and thinking it is not ready to carry the load of the concrete foundation and therefore the house. There are some facts that can assure the homeowner for this concern as well:
- Footings and foundations are prepared on an excavation of “undisturbed” soil. This means the surface of the soil is cohesive or of a consistent strength.
- Standing water does not absorb quickly or easily into the surface of a cohesive soil.
- Water can be removed from an excavation without requiring compaction of the soil.
Water present on the top of soil does not immediately present a problem as saturation takes time. Depending on the type of soil and likely for most soils encountered for a foundation, that time can be considerable. However, the contractor must determine if the water presence has been sufficient to alter the surface of the prepared excavation. The IRC2 provides reference to this condition as follows in section R401.4.2:
Compressible or shifting soil. Instead of a complete geotechnical evaluation, when top or subsoils are compressible or shifting, they shall be removed to a depth and width sufficient to assure stable moisture content in each active zone and shall not be used as fill or stabilized within each active zone by chemical, dewatering or presaturation.
In other words, when the surface condition of the excavation is changing or no longer holds the condition of the designed soil capacity, remediation needs to occur. This is often a last resort that can be prevented with some common precautions including:
- Limit the time water stands in the excavation by moving forward with concrete placement or removing the water.
- Control the amount of traffic in the excavation. Foot traffic in areas of standing water will accelerate working the moisture into the soil, impacting the surface condition and the compaction of that top layer.
- Prior to concrete placement, all loose silty soils should be removed with a shovel along the bottom of the formwork, exposing the cohesive base.
Saturated soils do have a lower bearing capacity than the predicted or assumed condition. This is mainly due to expansion of the soils as the volume is increased with water. If concrete placement can be achieved soon enough, it is unlikely the water will have moved into the soil sufficient to disturb the compaction and bearing capacity will be maintained.
When soils are determined to be saturated or when the placement could not be made quickly enough, the excavation should be cleared of the loosened soils, mud and water sufficient to re-establish the soil-bearing capacity assumed for the design.
Contractors should not be surprised to hear this concern from the homeowner. Knowing the facts, providing the reassurance and identifying the resources that can support your position are keys to a productive conversation on this issue. In fact, the contractor may very well have anticipated the inclement weather, and as stated previously, designed the forms for the movement of water. The contractor may also have experience in the remediation of the saturated soil condition, either removing the affected regions or drying out the excavation and ensuring compaction. Knowing the provisions of ACI 332-14, and the IRC, will help deliver a positive outcome to a natural part of the construction process.
Want to know more? Contact CFA Executive Director, Jim Baty at 866-232-9255 or by email at jbaty@cfawalls.org. The CFA is a national association with the mission to support the cast-in-place contractor as the voice and recognized authority for the residential concrete industry. ACI 332-14 can be obtained by contacting the CFA or by visiting the American Concrete Institute (www.concrete.org) and ordering from their bookstore.
References:
1 Residential Code Requirements for Structural Concrete (ACI 332-14) and Commentary published by the American Concrete Institute, 38800 Country Club Drive, Farmington Hills, MI 48331 | Phone: 248-848-3700 | www.concrete.org
2 2012 International Residential Code® For One- and Two-Family Dwellings published by the International Code Council, Inc., 4051 West Flossmoor Road, Country Club Hills, IL 60478-5795 | Phone 1-888-422-7233 | www.iccsafe.org